High School Building Project Home
Monthly Project Update
-
Work Completed
- Area B Bathroom Fixtures
- Area B Electrical Finishes
- Area B Doors & Hardware
- Area B Science Lab Casework
- Area B Pad Out
- Area C Hanging Sheetrock
- Area C Mechanical, Electrical, and Plumbing Rough-Ins
- Area C Exterior Window Install
- Area B Vestibule/Corridor Tile
Work in Progress
- Area C Stage Tile·
- Area C Ceiling Grid·
- Area C Corridor Tile·
- Area C Painting
Work in Upcoming
- Area C Baffle Ceiling System
- Area C Elevator
- Area C Polished Concrete
- Area C Bleachers
- Area C Casework
- Mechanical, Electrical, and Plumbing Finishes
-
Work Completed
- Area B Painting·
- Area B Tile
- Area B Casework
- Area C 2-Story Roof
- Area C First Level Slab on Grade
- Area C Interior Framing
- Area C Above Ceiling Electrical Rough-Ins
Work in Progress
- Area B Bathroom Fixtures
- Area B Electrical Finishes
- Area B Doors & Hardware
- Area B Science Lab Casework
- Area C Hanging Sheetrock
- Area C Mechanical, Electrical, and Plumbing Rough-Ins
- Area C Exterior Window Install
Work in Upcoming
- Area B ACT Pad Out
- Area B Flooring
- Area C Painting
- Area C Baffle Ceiling System
- Area C Stairs
- Area C Elevator
-
Work Completed
- Area B Drywall/Tape/Mud/Sand
- Area B Mechanical, Electrical, Plumbing Rough-Ins
- Area C Exterior Wall
- Area C Stage/Commons Roofing
- Area C Underground Electrical and Plumbing Rough-Ins
- Area C Roof/Window Blocking
- Area C Second Level Deck Topping
Work in Progress
- Area B Painting
- Area B Tile
- Aea B Casework
- Area C 2-Story Roof
- Area C First Level Slab on Grade
- Area C Interior Framing
- Area C Above Ceiling Electrical Rough-Ins
Work in Upcoming
- Area B Bathroom Fixtures
- Area B Electrical Finishes
- Area B Ceiling Grid
- Area B Doors & Hardware
- Area B Flooring
- Area C Hanging Sheetrock
- Area C Mechanical, Electrical, and Plumbing Rough-Ins
- Area C Exterior Window Install
-
Work Completed
- Area D 2nd Half Kitchen Overbuild
- Area B Interior Framing
- Area B Exterior Windows
- Area C Structural Steel
- Area C Stage/Commons
Work in Progress
- Area A Greenhouse
- Area B Drywall/Tape/Mud/Sand
- Area B Mechanical, Electrical, Plumbing Rough-Ins
- Area C Exterior Wall
- Area C Stage/Commons Roofing
- Area C Underground Electrical and Plumbing Rough-Ins
- Area C Roof/Window Blocking
Work in Upcoming
- Area B Painting
- Area B Tile
- Area B Casework
- Area C Raised Roofing
- Area C Stage/Commons Interior Framing
- Area C In Wall Mechanical, Electrical, and Plumbing Rough-Ins
- Area C Second Level Deck Topping
- Area C First Level Slab on Grade
-
Work Completed
- Area B Exterior Stud Walls.
- Area C Footings and Foundations.
- Area C Column Pads.
- Freezer Brick Veneer.
- Freezer Steel Decking.
- Greenhouse Firewall.
Work in Progress
- Area B Below Grade Mechanical, Electrical, and Plumbing Rough-Ins.
- Area B Slab Prep.
- Area B Roof Blocking.
- Area B Roofing.
- Area B Slab Pour.
- Area C Structural Steel.
- Area C Elevator Shaft.
Work in Upcoming
- Freezer Roof Construction.
- Greenhouse Construction.
- Area B Exterior Walls
- Area B Metal Panels.
- Area C Below Grade Mechanical, Electrical, and Plumbing Rough-Ins.
-
Work Completed
- Area A Punchlist Items.
- Area B Footing and Foundations Pour.
- Area B Steel Erection.
- Area B Backfill.
- Interior Gym Wall Painted.
- Current Phase Electrical and Mechanical Room Connections.
- Freezer Block and Brick Construction.
- Greenhouse Brick.
- Additional Head(s) at Light Poles.
- HVAC Heat Start-up.
Work in Progress
- Area B Below Grade Mechanical, Electrical, and Plumbing Rough-Ins.
- Area B Slab Prep.
- Area B Roof Blocking.
- Area B Roofing.
- Area B Slab Pour.
- Area C Footing and Foundation.
- Area C Column Pads.
Work in Upcoming
- Freezer Roof Construction.
- Greenhouse Construction.
- Area B Exterior Walls
- Area B Metal Panels.
- Area C Below Grade Mechanical, Electrical, and Plumbing Rough-Ins.
- Area C Backfill.
-
WORK COMPLETED
- Area A (West Wing Finishes)
- First lift of Asphalt at North Parking Lot
- Temporary Traffic Striping
- Fitness Room Finishes
- Gym Wall Constructed
- Area B Footing and Foundation Excavation
- Kitchen Overbuild to Support Roof Top Unit (HVAC)
WORK IN PROGRESS
- Locker Room Final Cleaning
- East Exterior Canopy
- Soffit and Parapet Wall Construction
- Freezer CMU Block Wall
- Area B Footing and Foundations Pour
- Area C Footing and Foundation Excavation
- Electrical and Mechanical Room Connections
- Continued Punchlist Work
WORK UPCOMING
- Area B Column Pads
- Area C Column Pads
- Area B & C Below Grade Mechanical, Electrical,and Plumbing Rough-Ins
- Area B & C Backfill
- Area B Structural Steel
- HVAC Heat Start-up
- Additional Head(s) at Light Poles
-
WORK COMPLETED
- Initial site demolition
- Building demolition
- Existing gym wall removed
- Abatement within the existing building
- Interior demolition of existing building
- Storm structures and piping installed and backfilled
- Sanitary sewer installed and backfilled
- North parking lot grading completed
- First half of curb and gutter poured
- Interior structural steel installation
- Framing, drywall, taping, and sanding completed
- Mechanical, electrical, and plumbing in-wall rough-ins
- Roofing work completed on the existing building
- Mechanical Upgrades for the existing building
WORK IN PROGRESS
- Final grading at the north parking lot
- New/replacement window installation
- Painting throughout Area A
- Ceiling grid installation
- Above-ceiling electrical installation
- Above-ceiling mechanical installation
- Flooring installation throughout existing building
- Casework installation in district offices and classrooms
WORK UPCOMING
- Ceiling tile installation
- Asphalt paving at the north parking lot
- Bathroom accessory installation
- Interior glass installation
- Trenching footings for the new addition
- Construction of the new gym wall
- Underground MEP (mechanical, electrical, plumbing) rough-ins forthe new addition
- Turf installation at the weight room
- Sidewalk installation at the north parking lot