Monthly Project Update

  • Work Completed

    • Area C ( 1st Floor / 2nd Floor / Stage / Commons)
      • Ceiling Grid
      • Corridor / Bathroom Tile
      • Painting
      • Casework
      • Media Center Baffle Ceiling System
    • Summer Renovations (Kitchen / CTE / Classroom / Offices / Wrestling Room)
      • Selective Demo
      • Mechanical, Electrical, Plumbing Demolition
      • Structural Steel Install
      • Saw Cutting

    Work in Progress

    • Exterior Veneer
      • Metal Panels
      • Brick
    • South Sitework
      • Grading
      • Underground Utilities / Electrical
      • Curbs / Sidewalk
      • Outdoor Learning Center
    • Area C ( 1st Floor / 2nd Floor / Stage / Commons)
      • Mechanical, Electrical, and Plumbing Finishes
      • Nano Wall Systems
      • Bleachers
    • Summer Renovations (Kitchen / CTE / Classroom / Offices / Wrestling Room)
      • Mechanical, Electrical, Plumbing Rough-Ins
      • Freezer / Cooler Concrete Slab
      • Interior Framing
      • Wrestling Concrete Slab

    Work in Upcoming  

    • Summer Renovations (Kitchen / CTE / Classroom / Offices / Wrestling Room)
      • Door Frames
      • Drywall / Tape / Mud / Sand
      • Painting
      • Ceiling Grid
      • Mechanical, Electrical, Plumbing Finishes
      • ACT Pad Out
      • Overhead Doors
      • Exterior Storefronts
    • South Sitework
      • Outdoor Learning Center Turf
      • Site Lighting
      • Asphalt
    • North Sitework
      • Grading
      • Underground Utilities / Electrical
      • Curbs / Sidewalks
      • Site Lighting
      • Asphalt
  • Work Completed

    • Area B (Admin)
      • Casework
      • Vestibule Storefront
    • Area C ( 1st Floor / 2nd Floor / Stage / Commons)
      • Elevator
      • Stage Rigging
      • Stage Cloud Ceilings

    Work in Progress

    • Exterior Veneer
      • Metal Panels
      • Brick
    • Sitework
      • Grading / Utilities
    • Area C ( 1st Floor / 2nd Floor / Stage / Commons)
      • Ceiling Grid
      • Corridor / Bathroom Tile
      • Painting
      • Casework
      • Media Center Baffle Ceiling System
      • Mechanical, Electrical, and Plumbing Finishes
      • Nano Wall Systems
      • Bleachers
    • Wrestling / Classrooms / Corridor
      • Selective Demo

    Work in Upcoming  

    • Shop Space
      • Demo Dust Collector
      • Selective Demo
      • Floor Saw Cutting
      • Concrete Slab Pour
      • Interior Framing
      • Mechanical / Electrical / Plumbing Rough-Ins
    • Wrestling / Classrooms / Corridor
      • Bar joist installation
      • Floor Saw Cutting
      • Concrete Slab Pour
      • Interior Framing
      • Mechanical / Electrical / Plumbing Rough-Ins
    • Kitchen
      • Freezer / Cooler Installation
      • Floor Saw Cutting
      • Mechanical / Electrical / Plumbing Rough-Ins
      • Floor Pour Back
  • Work Completed

    • Area B Bathroom Fixtures
    • Area B Electrical Finishes
    • Area B Doors & Hardware
    • Area B Science Lab Casework
    • Area B Pad Out
    • Area C Hanging Sheetrock
    • Area C Mechanical, Electrical, and Plumbing Rough-Ins    
    • Area C Exterior Window Install
    • Area B Vestibule/Corridor Tile

    Work in Progress

    • Area C Stage Tile·      
    • Area C Ceiling Grid·      
    • Area C Corridor Tile·      
    • Area C Painting

    Work in Upcoming

    • Area C Baffle Ceiling System
    • Area C Elevator
    • Area C Polished Concrete
    • Area C Bleachers
    • Area C Casework
    • Mechanical, Electrical, and Plumbing Finishes
  • Work Completed

    • Area B Painting·      
    • Area B Tile
    • Area B Casework
    • Area C 2-Story Roof
    • Area C First Level Slab on Grade
    • Area C Interior Framing
    • Area C Above Ceiling Electrical Rough-Ins

    Work in Progress

    • Area B Bathroom Fixtures
    • Area B Electrical Finishes
    • Area B Doors & Hardware
    • Area B Science Lab Casework
    • Area C Hanging Sheetrock
    • Area C Mechanical, Electrical, and Plumbing Rough-Ins 
    • Area C Exterior Window Install

    Work in Upcoming

    • Area B ACT Pad Out
    • Area B Flooring
    • Area C Painting
    • Area C Baffle Ceiling System
    • Area C Stairs
    • Area C Elevator
  • Work Completed

    • Area B Drywall/Tape/Mud/Sand
    • Area B Mechanical, Electrical, Plumbing Rough-Ins
    • Area C Exterior Wall
    • Area C Stage/Commons Roofing
    • Area C Underground Electrical and Plumbing Rough-Ins
    • Area C Roof/Window Blocking
    • Area C Second Level Deck Topping

    Work in Progress

    • Area B Painting
    • Area B Tile
    • Aea B Casework
    • Area C 2-Story Roof
    • Area C First Level Slab on Grade
    • Area C Interior Framing
    • Area C Above Ceiling Electrical Rough-Ins

    Work in Upcoming

    • Area B Bathroom Fixtures
    • Area B Electrical Finishes 
    • Area B Ceiling Grid
    • Area B Doors & Hardware
    • Area B Flooring
    • Area C Hanging Sheetrock
    • Area C Mechanical, Electrical, and Plumbing Rough-Ins
    • Area C Exterior Window Install
  • Work Completed

    • Area D 2nd Half Kitchen Overbuild
    • Area B Interior Framing
    • Area B Exterior Windows
    • Area C Structural Steel
    • Area C Stage/Commons

    Work in Progress

    • Area A Greenhouse
    • Area B Drywall/Tape/Mud/Sand
    • Area B Mechanical, Electrical, Plumbing Rough-Ins
    • Area C Exterior Wall
    • Area C Stage/Commons Roofing
    • Area C Underground Electrical and Plumbing Rough-Ins
    • Area C Roof/Window Blocking

    Work in Upcoming

    • Area B Painting
    • Area B Tile
    • Area B Casework
    • Area C Raised Roofing
    • Area C Stage/Commons Interior Framing
    • Area C In Wall Mechanical, Electrical, and Plumbing Rough-Ins
    • Area C Second Level Deck Topping
    • Area C First Level Slab on Grade
  • Work Completed

    • Area B Exterior Stud Walls.
    • Area C Footings and Foundations.
    • Area C Column Pads.
    • Freezer Brick Veneer.
    • Freezer Steel Decking.
    • Greenhouse Firewall.

    Work in Progress

    • Area B Below Grade Mechanical, Electrical, and Plumbing Rough-Ins.
    • Area B Slab Prep.
    • Area B Roof Blocking.
    • Area B Roofing.
    • Area B Slab Pour.
    • Area C Structural Steel.
    • Area C Elevator Shaft.

    Work in Upcoming

    • Freezer Roof Construction.
    • Greenhouse Construction.
    • Area B Exterior Walls
    • Area B Metal Panels.
    • Area C Below Grade Mechanical, Electrical, and Plumbing Rough-Ins.
  • Work Completed

    • Area A Punchlist Items.
    • Area B Footing and Foundations Pour.
    • Area B Steel Erection.
    • Area B Backfill.
    • Interior Gym Wall Painted.
    • Current Phase Electrical and Mechanical Room Connections.
    • Freezer Block and Brick Construction.
    • Greenhouse Brick.
    • Additional Head(s) at Light Poles.
    • HVAC Heat Start-up.

    Work in Progress

    • Area B Below Grade Mechanical, Electrical, and Plumbing Rough-Ins.
    • Area B Slab Prep.
    • Area B Roof Blocking.
    • Area B Roofing.
    • Area B Slab Pour.
    • Area C Footing and Foundation.
    • Area C Column Pads.

    Work in Upcoming

    • Freezer Roof Construction.
    • Greenhouse Construction.
    • Area B Exterior Walls
    • Area B Metal Panels.
    • Area C Below Grade Mechanical, Electrical, and Plumbing Rough-Ins.
    • Area C Backfill.
  • WORK COMPLETED

    • Area A (West Wing Finishes)
    • First lift of Asphalt at North Parking Lot
    • Temporary Traffic Striping
    • Fitness Room Finishes
    • Gym Wall Constructed
    • Area B Footing and Foundation Excavation
    • Kitchen Overbuild to Support Roof Top Unit (HVAC)

    WORK IN PROGRESS

    • Locker Room Final Cleaning
    • East Exterior Canopy
    • Soffit and Parapet Wall Construction
    • Freezer CMU Block Wall
    • Area B Footing and Foundations Pour
    • Area C Footing and Foundation Excavation
    • Electrical and Mechanical Room Connections
    • Continued Punchlist Work

    WORK UPCOMING

    • Area B Column Pads
    • Area C Column Pads
    • Area B & C Below Grade Mechanical, Electrical,and Plumbing Rough-Ins
    • Area B & C Backfill
    • Area B Structural Steel
    • HVAC Heat Start-up
    • Additional Head(s) at Light Poles
  • WORK COMPLETED

    • Initial site demolition
    • Building demolition
    • Existing gym wall removed
    • Abatement within the existing building
    • Interior demolition of existing building
    • Storm structures and piping installed and backfilled
    • Sanitary sewer installed and backfilled
    • North parking lot grading completed
    • First half of curb and gutter poured
    • Interior structural steel installation
    • Framing, drywall, taping, and sanding completed
    • Mechanical, electrical, and plumbing in-wall rough-ins
    • Roofing work completed on the existing building
    • Mechanical Upgrades for the existing building

    WORK IN PROGRESS

    • Final grading at the north parking lot
    • New/replacement window installation
    • Painting throughout Area A
    • Ceiling grid installation
    • Above-ceiling electrical installation
    • Above-ceiling mechanical installation
    • Flooring installation throughout existing building
    • Casework installation in district offices and classrooms

    WORK UPCOMING

    • Ceiling tile installation
    • Asphalt paving at the north parking lot
    • Bathroom accessory installation
    • Interior glass installation
    • Trenching footings for the new addition
    • Construction of the new gym wall
    • Underground MEP (mechanical, electrical, plumbing) rough-ins forthe new addition
    • Turf installation at the weight room
    • Sidewalk installation at the north parking lot

Architectural floor plan showing a complex building layout with various rooms and sections.

Timeline showing project phases: Date February 20, Design Spring 2008, Bidding Winter 2020-25, and Construction Spring 2025 - Fall 2026.